Enterasys Enterasys SecureStack B2 B2G124-24 Guia de Instalação Página 23

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 22
Connectivity
SecureStack B2 Installation Guide 1-5
High-Speed Stack Connections
Theswitcheshaverearpanelconnectorsforhighspeedconnectionsinastack
configuration.Thehighspeedstackingcablesusedfortheconnectionsareoptionalitems
andmustbeorderedseparately.Stackingcablesareavailableinthreelengths:1foot,
1meterand5meters.SeeConnectingHighSpeedStacking
Cablesonpage 3 10for
detailsonthesecables.
Redundant Power Supply Capability
Theswitchhaspowersupplyredundancycapabilitywhenconnectedtoanoptional
externalredundantpowersupply(RPS).Iftheinternalpowersupplyfails,theRPS
assumestheentireloadoftheswitchwithoutinterruptingnetworktraffic.Theinternal
powersupplyandRPSeachhavetheirownACpowerconnection,whichenables
the
connectionofeachpowersupplytoadifferentACpowercircuitforadditionalACpower
sourceredundancy.
Connectivity
TheswitchconnectstoEthernetnetworksorworkstationsviathefixedfrontpanelRJ45
connectorsandfouruplinkportsthatsupportoptionalMiniGBICs.
Atthetimeofthisprinting,theMiniGBICsthatareavailablefromEnterasysand
supportedbyB2switchesaredescribedinTable 11onpage 16.
TheseMiniGBICsmeet
orexceedtheIEEE802.3z1998standard.
Vista de página 22
1 2 ... 18 19 20 21 22 23 24 25 26 27 28 ... 77 78

Comentários a estes Manuais

Sem comentários