Enterasys SecureStack A2 A2H124-48P Guia de Instalação Página 68

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 67
Using LANVIEW
4-6 Troubleshooting
Amber Solid. Port is linked, but traffic
is not being received or
transmitted by the interface.
PoE power has failed.
PoE power may have been
deactivated because of
excessive power requirement
or deactivated by
configuration.
Power Supply failed.
1. Check the attached powered device to
see if it is defective.
2. Internal power supply failed, contact
Enterasys Networks for technical
support.
Blinking. Port is linked and
traffic is being received or
transmitted by the interface.
PoE power has failed.
PoE power may have been
deactivated because of
excessive power requirement
or deactivated by
configuration.
Power supply failed.
1. Check the attached powered device to
see if it is defective.
2. Internal power supply failed, contact
Enterasys Networks for technical
support.
Table 4-1 LANVIEW LEDs (continued)
LED Color State Recommended Action
Vista de página 67
1 2 ... 63 64 65 66 67 68 69 70 71 72 73 ... 81 82

Comentários a estes Manuais

Sem comentários